SC Administrative Law Court Decisions
CAPTION:
Weyerhaeuser Company, Marlboro Paper Mill vs. DHEC |
AGENCY:
South Carolina Department of Health and Environmental Control |
PARTIES:
Petitioner:
Weyerhaeuser Company, Marlboro Paper Mill
Respondent:
South Carolina Department of Health and Environmental Control |
|
DOCKET NUMBER:
02-ALJ-07-0554-CC |
APPEARANCES:
n/a |
|
ORDERS:
|
|
In accordance with South Carolina Regulation 61-62.5, Standard No. 7
(PSD), No. 2 NCG Incinerator (TV ID 17) shall not exhibit carbon
monoxide (CO) emissions in excess of 5.14 lb/hr and 22.5 tons per year.
Compliance with this emission limit shall be demonstrated through source
testing conducted no later than 180 days after the issue date of this
construction permit. For periodic monitoring of CO emissions, source
testing of the recovery furnace shall be as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
Source tests shall be conducted and reported per additional condition
number 24.
|
|
In accordance with South Carolina Regulation 61-62.5, Standard No. 7
(PSD), No. 2 NCG Incinerator (TV ID 17) shall not exhibit sulfuric acid
(H2SO4) emissions in excess of 0.132 lb/hr and 0.58 tons per year.
Compliance with this emission limit shall be demonstrated through source
testing conducted no later than 180 days after the issue date of this
construction permit. For periodic monitoring of H2SO4 emissions, source
testing of the recovery furnace shall be as follows:
If source test emissions are less than 25%, then no further testing is
required for the life of permit. If two consecutive annual test emissions
are less than 75%, then no further testing is required for life of permit.
Otherwise, source testing will be conducted on an annual basis.
Source tests shall be conducted and reported per additional condition
number 24.
|
|
In accordance with South Carolina Standard 61-62.5, Standard No. 7
(PSD), volatile organic compounds (VOC) emissions from the No. 2 NCG
Incinerator shall not exceed 6.1 lb/hr and 26.7 tons per year.
Compliance with this emission limit shall be demonstrated through source
testing conducted no later than 180 days after the issue date of this
construction permit.
In accordance with SC R.61-62.5, Standard 5.1, stack tests shall be
conducted every four years (four year schedule beginning with initial
compliance source test). Stack tests shall be conducted and reported in
accordance with additional condition number 24.
|
Part 70 Air Operating Permit TV-1680-0043
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 8.05 as
follows:
Condition
Number
|
Condition
|
|
|
Compliance with this NOx, SO2, CO, VOC and H2SO4 emission limits shall
be demonstrated through an INITIAL source test conducted no later than
180 days after the issue date of construction permit 1680-0043-DE.
For periodic monitoring of NOx, SO2, CO, and H2SO4 emissions, source
testing of the recovery furnace shall be as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be
conducted every two years (two year schedule beginning with initial
compliance source test).. The biennial stack test will also serve as the
required periodic monitoring for VOC.
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 9.06. as
follows:
Condition
Number
|
Condition
|
Unit 09-Smelt Dissolving Tank
|
|
Compliance with this SO2 and VOC emission limit shall be demonstrated
through an INITIAL source test conducted no later than 180 days after the
issue date of construction permit 1680-0043-DF. For periodic monitoring of
SO2, emissions, source testing of the smelt dissolving tank shall be as
follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be
conducted every two years (two year schedule beginning with initial
compliance source test).. The biennial stack test will also serve as the
required periodic monitoring for VOC.
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 16.03
and 16.05, as follows:
Condition
Number
|
Condition
|
|
|
Compliance with NOx and H2SO4 emission limits shall be demonstrated
through an INITIAL source test conducted no later than 180 days after the
issue date of construction permit 1680-0043-DG. For periodic monitoring
of NOx and H2SO4, emissions, source testing of the No. 2 NCG Incinerator
shall be as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
|
|
Compliance with the CO emission limit shall be demonstrated through an
initial source test as required by construction permit 1680-0043-DG. For
periodic monitoring of CO, emissions, source testing of the No. 2 NCG
Incinerator shall be as follows:
If source test emissions are less than 25% of the limit, then no further testing
is required for the life of permit. If two consecutive annual test emissions
are less than 75%, then no further testing is required for life of permit.
Otherwise, source testing will be conducted on an annual basis.
|
|
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 11.05.
as follows:
Condition
Number
|
Condition
|
|
|
Compliance with this NOx, SO2, CO, and H2SO4 emission limits shall be
demonstrated for periodic monitoring purposes as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be
conducted every two years (two year schedule beginning with initial
compliance source test).. The biennial stack test will also serve as the
required periodic monitoring for VOC.
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 14.05.
as follows:
Condition
Number
|
Condition
|
Unit 14 Hogged Fuel Boiler
|
|
Compliance with this NOx, CO, and H2SO4 emission limits shall be
demonstrated for periodic monitoring purposes as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be
conducted every two years (two year schedule beginning with initial
compliance source test).. The biennial stack test will also serve as the
required periodic monitoring for VOC.
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 15.02.
as follows
Condition
Number
|
Condition
|
|
|
Compliance with this CO emission limit shall be demonstrated for periodic
monitoring purposes as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
|
I find that for good cause shown, and with the consent of the parties, this matter should
be and hereby is dismissed.
AND IT IS SO ORDERED.
March 26, 2003____________________________
C. Dukes Scott
Administrative Law Judge
|
In accordance with South Carolina Regulation 61-62.5, Standard No. 7
(PSD), No. 2 NCG Incinerator (TV ID 17) shall not exhibit carbon
monoxide (CO) emissions in excess of 5.14 lb/hr and 22.5 tons per year.
Compliance with this emission limit shall be demonstrated through source
testing conducted no later than 180 days after the issue date of this
construction permit. For periodic monitoring of CO emissions, source
testing of the recovery furnace shall be as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
Source tests shall be conducted and reported per additional condition
number 24.
|
|
In accordance with South Carolina Regulation 61-62.5, Standard No. 7
(PSD), No. 2 NCG Incinerator (TV ID 17) shall not exhibit sulfuric acid
(H2SO4) emissions in excess of 0.132 lb/hr and 0.58 tons per year.
Compliance with this emission limit shall be demonstrated through source
testing conducted no later than 180 days after the issue date of this
construction permit. For periodic monitoring of H2SO4 emissions, source
testing of the recovery furnace shall be as follows:
If source test emissions are less than 25%, then no further testing is
required for the life of permit. If two consecutive annual test emissions
are less than 75%, then no further testing is required for life of permit.
Otherwise, source testing will be conducted on an annual basis.
Source tests shall be conducted and reported per additional condition
number 24.
|
|
In accordance with South Carolina Standard 61-62.5, Standard No. 7
(PSD), volatile organic compounds (VOC) emissions from the No. 2 NCG
Incinerator shall not exceed 6.1 lb/hr and 26.7 tons per year.
Compliance with this emission limit shall be demonstrated through source
testing conducted no later than 180 days after the issue date of this
construction permit.
In accordance with SC R.61-62.5, Standard 5.1, stack tests shall be
conducted every four years (four year schedule beginning with initial
compliance source test). Stack tests shall be conducted and reported in
accordance with additional condition number 24.
|
Part 70 Air Operating Permit TV-1680-0043
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 8.05 as
follows:
Condition
Number
|
Condition
|
|
|
Compliance with this NOx, SO2, CO, VOC and H2SO4 emission limits shall
be demonstrated through an INITIAL source test conducted no later than
180 days after the issue date of construction permit 1680-0043-DE.
For periodic monitoring of NOx, SO2, CO, and H2SO4 emissions, source
testing of the recovery furnace shall be as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be
conducted every two years (two year schedule beginning with initial
compliance source test).. The biennial stack test will also serve as the
required periodic monitoring for VOC.
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 9.06. as
follows:
Condition
Number
|
Condition
|
Unit 09-Smelt Dissolving Tank
|
|
Compliance with this SO2 and VOC emission limit shall be demonstrated
through an INITIAL source test conducted no later than 180 days after the
issue date of construction permit 1680-0043-DF. For periodic monitoring of
SO2, emissions, source testing of the smelt dissolving tank shall be as
follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be
conducted every two years (two year schedule beginning with initial
compliance source test).. The biennial stack test will also serve as the
required periodic monitoring for VOC.
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 16.03
and 16.05, as follows:
Condition
Number
|
Condition
|
|
|
Compliance with NOx and H2SO4 emission limits shall be demonstrated
through an INITIAL source test conducted no later than 180 days after the
issue date of construction permit 1680-0043-DG. For periodic monitoring
of NOx and H2SO4, emissions, source testing of the No. 2 NCG Incinerator
shall be as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
|
|
Compliance with the CO emission limit shall be demonstrated through an
initial source test as required by construction permit 1680-0043-DG. For
periodic monitoring of CO, emissions, source testing of the No. 2 NCG
Incinerator shall be as follows:
If source test emissions are less than 25% of the limit, then no further testing
is required for the life of permit. If two consecutive annual test emissions
are less than 75%, then no further testing is required for life of permit.
Otherwise, source testing will be conducted on an annual basis.
|
|
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 11.05.
as follows:
Condition
Number
|
Condition
|
|
|
Compliance with this NOx, SO2, CO, and H2SO4 emission limits shall be
demonstrated for periodic monitoring purposes as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be
conducted every two years (two year schedule beginning with initial
compliance source test).. The biennial stack test will also serve as the
required periodic monitoring for VOC.
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 14.05.
as follows:
Condition
Number
|
Condition
|
Unit 14 Hogged Fuel Boiler
|
|
Compliance with this NOx, CO, and H2SO4 emission limits shall be
demonstrated for periodic monitoring purposes as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be
conducted every two years (two year schedule beginning with initial
compliance source test).. The biennial stack test will also serve as the
required periodic monitoring for VOC.
|
Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 15.02.
as follows
Condition
Number
|
Condition
|
|
|
Compliance with this CO emission limit shall be demonstrated for periodic
monitoring purposes as follows:
If source test emissions are less than 25% of the limit, then no further
testing is required for the life of permit. If two consecutive annual test
emissions are less than 75%, then no further testing is required for life of
permit. Otherwise, source testing will be conducted on an annual basis.
|
I find that for good cause shown, and with the consent of the parties, this matter should
be and hereby is dismissed.
AND IT IS SO ORDERED.
March 26, 2003 ____________________________
C. Dukes Scott
Administrative Law Judge
|
Copyright © 2024 South Carolina Administrative
Law Court