South Carolina              
Administrative Law Court
Edgar A. Brown building 1205 Pendleton St., Suite 224 Columbia, SC 29201 Voice: (803) 734-0550

SC Administrative Law Court Decisions

CAPTION:
Weyerhaeuser Company, Marlboro Paper Mill vs. DHEC

AGENCY:
South Carolina Department of Health and Environmental Control

PARTIES:
Petitioner:
Weyerhaeuser Company, Marlboro Paper Mill

Respondent:
South Carolina Department of Health and Environmental Control
 
DOCKET NUMBER:
02-ALJ-07-0554-CC

APPEARANCES:
n/a
 

ORDERS:

14.

In accordance with South Carolina Regulation 61-62.5, Standard No. 7 (PSD), No. 2 NCG Incinerator (TV ID 17) shall not exhibit carbon monoxide (CO) emissions in excess of 5.14 lb/hr and 22.5 tons per year.

Compliance with this emission limit shall be demonstrated through source testing conducted no later than 180 days after the issue date of this construction permit. For periodic monitoring of CO emissions, source testing of the recovery furnace shall be as follows:

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

Source tests shall be conducted and reported per additional condition number 24.

15.

In accordance with South Carolina Regulation 61-62.5, Standard No. 7 (PSD), No. 2 NCG Incinerator (TV ID 17) shall not exhibit sulfuric acid (H2SO4) emissions in excess of 0.132 lb/hr and 0.58 tons per year.

Compliance with this emission limit shall be demonstrated through source testing conducted no later than 180 days after the issue date of this construction permit. For periodic monitoring of H2SO4 emissions, source testing of the recovery furnace shall be as follows:

If source test emissions are less than 25%, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

Source tests shall be conducted and reported per additional condition number 24.

16.

In accordance with South Carolina Standard 61-62.5, Standard No. 7 (PSD), volatile organic compounds (VOC) emissions from the No. 2 NCG Incinerator shall not exceed 6.1 lb/hr and 26.7 tons per year.

Compliance with this emission limit shall be demonstrated through source testing conducted no later than 180 days after the issue date of this construction permit.

In accordance with SC R.61-62.5, Standard 5.1, stack tests shall be conducted every four years (four year schedule beginning with initial compliance source test). Stack tests shall be conducted and reported in accordance with additional condition number 24.

Part 70 Air Operating Permit TV-1680-0043

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 8.05 as follows:

Condition Number

Condition

Unit 08-Recovery Furnace

8.05

Compliance with this NOx, SO2, CO, VOC and H2SO4 emission limits shall be demonstrated through an INITIAL source test conducted no later than 180 days after the issue date of construction permit 1680-0043-DE.

For periodic monitoring of NOx, SO2, CO, and H2SO4 emissions, source testing of the recovery furnace shall be as follows:

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be conducted every two years (two year schedule beginning with initial compliance source test).. The biennial stack test will also serve as the required periodic monitoring for VOC.

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 9.06. as follows:

Condition Number

Condition

Unit 09-Smelt Dissolving Tank

9.06

Compliance with this SO2 and VOC emission limit shall be demonstrated through an INITIAL source test conducted no later than 180 days after the issue date of construction permit 1680-0043-DF. For periodic monitoring of SO2, emissions, source testing of the smelt dissolving tank shall be as follows:

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be conducted every two years (two year schedule beginning with initial compliance source test).. The biennial stack test will also serve as the required periodic monitoring for VOC.

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 16.03 and 16.05, as follows:

Condition Number

Condition

Unit 16-NCG Incinerator

16.03

Compliance with NOx and H2SO4 emission limits shall be demonstrated through an INITIAL source test conducted no later than 180 days after the issue date of construction permit 1680-0043-DG. For periodic monitoring of NOx and H2SO4, emissions, source testing of the No. 2 NCG Incinerator shall be as follows:

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

16.05

Compliance with the CO emission limit shall be demonstrated through an initial source test as required by construction permit 1680-0043-DG. For periodic monitoring of CO, emissions, source testing of the No. 2 NCG Incinerator shall be as follows:

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 11.05. as follows:

Condition Number

Condition

Unit 11-No. 2 Lime Kiln

11.05

Compliance with this NOx, SO2, CO, and H2SO4 emission limits shall be demonstrated for periodic monitoring purposes as follows:

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be conducted every two years (two year schedule beginning with initial compliance source test).. The biennial stack test will also serve as the required periodic monitoring for VOC.

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 14.05. as follows:

Condition Number

Condition

Unit 14 Hogged Fuel Boiler

14.05

Compliance with this NOx, CO, and H2SO4 emission limits shall be demonstrated for periodic monitoring purposes as follows:

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be conducted every two years (two year schedule beginning with initial compliance source test).. The biennial stack test will also serve as the required periodic monitoring for VOC.

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 15.02. as follows

Condition Number

Condition

Unit 15-Package Boiler

15.02

Compliance with this CO emission limit shall be demonstrated for periodic monitoring purposes as follows:

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

I find that for good cause shown, and with the consent of the parties, this matter should be and hereby is dismissed.

AND IT IS SO ORDERED.

March 26, 2003____________________________

C. Dukes Scott

Administrative Law Judge

14.

In accordance with South Carolina Regulation 61-62.5, Standard No. 7 (PSD), No. 2 NCG Incinerator (TV ID 17) shall not exhibit carbon monoxide (CO) emissions in excess of 5.14 lb/hr and 22.5 tons per year.

 

Compliance with this emission limit shall be demonstrated through source testing conducted no later than 180 days after the issue date of this construction permit. For periodic monitoring of CO emissions, source testing of the recovery furnace shall be as follows:

 

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

 

Source tests shall be conducted and reported per additional condition number 24.

15.

In accordance with South Carolina Regulation 61-62.5, Standard No. 7 (PSD), No. 2 NCG Incinerator (TV ID 17) shall not exhibit sulfuric acid (H2SO4) emissions in excess of 0.132 lb/hr and 0.58 tons per year.

 

Compliance with this emission limit shall be demonstrated through source testing conducted no later than 180 days after the issue date of this construction permit. For periodic monitoring of H2SO4 emissions, source testing of the recovery furnace shall be as follows:

 

If source test emissions are less than 25%, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

 

Source tests shall be conducted and reported per additional condition number 24.

16.

In accordance with South Carolina Standard 61-62.5, Standard No. 7 (PSD), volatile organic compounds (VOC) emissions from the No. 2 NCG Incinerator shall not exceed 6.1 lb/hr and 26.7 tons per year.

 

Compliance with this emission limit shall be demonstrated through source testing conducted no later than 180 days after the issue date of this construction permit.

 

In accordance with SC R.61-62.5, Standard 5.1, stack tests shall be conducted every four years (four year schedule beginning with initial compliance source test). Stack tests shall be conducted and reported in accordance with additional condition number 24.

 

Part 70 Air Operating Permit TV-1680-0043

 

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 8.05 as follows:

Condition Number

Condition

Unit 08-Recovery Furnace

8.05

Compliance with this NOx, SO2, CO, VOC and H2SO4 emission limits shall be demonstrated through an INITIAL source test conducted no later than 180 days after the issue date of construction permit 1680-0043-DE.

For periodic monitoring of NOx, SO2, CO, and H2SO4 emissions, source testing of the recovery furnace shall be as follows:

 

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

 

In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be conducted every two years (two year schedule beginning with initial compliance source test).. The biennial stack test will also serve as the required periodic monitoring for VOC.

 

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 9.06. as follows:

Condition Number

Condition

Unit 09-Smelt Dissolving Tank

9.06

Compliance with this SO2 and VOC emission limit shall be demonstrated through an INITIAL source test conducted no later than 180 days after the issue date of construction permit 1680-0043-DF. For periodic monitoring of SO2, emissions, source testing of the smelt dissolving tank shall be as follows:

 

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

 

In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be conducted every two years (two year schedule beginning with initial compliance source test).. The biennial stack test will also serve as the required periodic monitoring for VOC.

 

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 16.03 and 16.05, as follows:

 

Condition Number

Condition

Unit 16-NCG Incinerator

16.03

Compliance with NOx and H2SO4 emission limits shall be demonstrated through an INITIAL source test conducted no later than 180 days after the issue date of construction permit 1680-0043-DG. For periodic monitoring of NOx and H2SO4, emissions, source testing of the No. 2 NCG Incinerator shall be as follows:

 

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

16.05

Compliance with the CO emission limit shall be demonstrated through an initial source test as required by construction permit 1680-0043-DG. For periodic monitoring of CO, emissions, source testing of the No. 2 NCG Incinerator shall be as follows:

 

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

 

 

 

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 11.05. as follows:

Condition Number

Condition

Unit 11-No. 2 Lime Kiln

11.05

Compliance with this NOx, SO2, CO, and H2SO4 emission limits shall be demonstrated for periodic monitoring purposes as follows:

 

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

 

In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be conducted every two years (two year schedule beginning with initial compliance source test).. The biennial stack test will also serve as the required periodic monitoring for VOC.

 

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 14.05. as follows:

Condition Number

Condition

Unit 14 Hogged Fuel Boiler

14.05

Compliance with this NOx, CO, and H2SO4 emission limits shall be demonstrated for periodic monitoring purposes as follows:

 

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

 

In accordance with SC R.61-62.5, Standard 5.1, stack tests for VOC shall be conducted every two years (two year schedule beginning with initial compliance source test).. The biennial stack test will also serve as the required periodic monitoring for VOC.

 

 

 

Amend PART 6.0 MONITORING AND REPORTING REQUIREMENTS B. Condition 15.02. as follows

Condition Number

Condition

Unit 15-Package Boiler

15.02

Compliance with this CO emission limit shall be demonstrated for periodic monitoring purposes as follows:

 

If source test emissions are less than 25% of the limit, then no further testing is required for the life of permit. If two consecutive annual test emissions are less than 75%, then no further testing is required for life of permit. Otherwise, source testing will be conducted on an annual basis.

 

I find that for good cause shown, and with the consent of the parties, this matter should be and hereby is dismissed.

 

AND IT IS SO ORDERED.

 

March 26, 2003                      ____________________________

                                                                                    C. Dukes Scott

                                                                                    Administrative Law Judge


Brown Bldg.

 

 

 

 

 